Check by Department


Legal Compliance ChecklistEHS

Sr. No.Legisltion CategoryStatute Legal ProvisionComplianceApplicabilityPenal ProvisionRequired Forms
1CommercialPetroleum Act, 1934/Petroleum Rules, 2002Section 3,4 read with Rule 43 (h)Exhibit conspicuously from sunrise to sunset a red flag and such warning lights as may be required by the ConservatorAny vessel, steamer or, tug towing or otherwise attending any vessel carrying or had carried onboard petroleum, from sunrise to sunsetImprisonment up to 1 month or fine up to Rs.1000/- or both and in case of continuance of offence Imprisonment up to 3 months or fine up to Rs. 5000/- or both (Section 23)NA
2CommercialPetroleum Act, 1934/Petroleum Rules, 2002Section 3,4 read with Rule 143, 147, 148Apply in Form VIII for a grant/ amendment/ renewal of a license to transport petroleum Class A/B in bulk on land for fueling of aircraft etcAny person desirous to transport petroleum Class A or B in bulk on land for fueling of aircraft, heavy vehicles, machineries and other stationery equipment by a mechanically propelled vehicleImprisonment up to 1 month or fine up to Rs.1000/- or both and in case of continuance of offence Imprisonment up to 3 months or fine up to Rs. 5000/- or both (Section 23)VIII
3CommercialElectricity Act, 2003/Central Electricity Regulatory Commission (Terms And Conditions For Recognition And Issue Of Renewable Energy Certificate For Renewable Energy Generation) Regulations, 2010Section 86 (1) read with Rule 11.4Ensure to fulfill renewable purchase obligation through procurement of the Renewable Energy CertificateAny person having contract demand of not less than one MVA and who consumes electricity procured from conventional fossil fuel based generation through open access.As determined by the commissionNA
4CommercialElectricity Act, 2003/Central Electricity Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010Section 177 read with Rule 63 (1)Intimate the owner, supplier and Electrical Inspector in writing and furnish a scale of the addition, alteration or erection.Every person proposing to and the contractor employed to erect a new building or structure or flood bank or to raise any road level or to carry out any other type of work, addition or alteration whether permanent or temporary, subsequent to the erection of an overhead lineImprisonment upto 3 months or fine up to Rs 1,00,000/- and for continuing default additional fine of Rs. 5000/- for each day of continuing default (Section 146)NA
5Environment, Health and SafetyAtomic Energy Act, 1962/Atomic Energy (Radiation Protection) Rules, 2004Section 17 read with Rule 20 (3)Intimate of any accident to the Special Officer, within 24 hours involving a source or loss of source of which he is the custodianEvery employer on occurrence of any accident1. Imprisonment upto 5 years or fine or both (Section 24) 2. Suspension of operation of the licence or revocation of licence (Rule 10(ii))Intimation Letter
6Environment, Health and SafetyAtomic Energy Act, 1962/Atomic Energy (Radiation Protection) Rules, 2004Section 30 read with Rule 26 b (i)Provide radiation doses to the therapy patientsEvery licensee carrying out diagnostic or therapeutic work using radiation generating equipment, sealed or unsealed sourcesImprisonment upto 5 years or fine or both ( 24) 2. Suspension of operation of the licence or revocation of licence (Rule 10(ii))NA
7Environment, Health and SafetyEnvironment (Protection) Act, 1986/Hazardous And Other Wastes (Management And Transboundary Movement) Rules, 2016Section 25 read with Rule 6(5)Maintain record of hazardous and other wastes in Form 3.Every authorised occupierImprisonment upto 5 years and Fine upto Rs. 1,00,000/- or both, and in case of continuous contravention additional fine upto Rs. 5000/- for every day and in further continuation of contravention 1 year, further Imprisonment upto 7 years ( 15)Form no. 3
8Environment, Health and SafetyEnvironment (Protection) Act, 1986/E-Waste (Management) Rules, 2016Section 25 read with Rule 4 (3)Ensure that no damage is caused to the environment during storage and transportation of e-waste.Every Manufacturer generating E-WasteImprisonment upto 5 years and Fine upto Rs. 1,00,000/- or both, and in case of continuous contravention additional fine upto Rs. 5000/- for every day and in further continuation of contravention of 1 year, further Imprisonment upto 7 years (Section 15)NA